The all-new leisure centre in Maidenhead is a stunning building, and features a full BS8300-compliant Changing Places facility
Featuring a height-adjustable basin, a mobile shower/changing trolley and a XY ceiling hoist system the facility is accessed from both dry and wet sides of the centre.
The leisure centre was constructed by Wates Construction who contracted directly with Wealden Rehab for the installation of the specialist items, alongside their M&E contractor.
Featured:
- Plus powered basin bracket - see here
- Barella mobile shower trolley - see here
- GoLift ceiling hoist, to XY track system - see here
Commissioned in August 2020