This challenging project was turned down by three other companies before the OT approached our project management team for a solution.
With a real empathy for the challenges faced by parents caring for their child at home, and a in-depth discussion with the architect and contractor, we were proud to have completed this stunning installation.
Using the flexible V5 Duo system, this extensive system connects three interlinked rooms with complete XY room-cover hoists complete with electro-mechanical safety gates and a powered turntable. The images speak for themselves - a fantastic finish which is fully complemented by the attention to detail within the entire building project.
The Avero bath and Barella Adult shower trolley, which can also be seen in the images, work extremely well with the overhead hoist system.