This Gateway Centre, located in the county town of Maidstone, was a truly ground-breaking project with accessibility high up on the agenda. The Changing Place makes the Gateway a truly inclusive provision and the bright welcoming surroundings sets the hygiene suite off excellently.
As a developing provision, KCC looked to Wealden Rehab to help them build the equipment specification and hone the room designs to ensure that the projects completed on time and on budget.
Wealden Rehab worked closely with the main contractor to ensure that the building fabric was sufficient to take the structural loadings, and to oversee the enabling works.
Products supplied:
- B1350 Aquaclean 8000 PlusCare WC
- B1416 CT190 Adult Changing Table
- H2006 Voyager Overhead Hoist to a 5m track, fixed wall to wall.